Good Enough Line

Finish on time by knowing when to stop.

Good Enough Line

What this fixes

Some work keeps getting refined long after it has already done its job - a deck on its ninth revision, a report reworded again, a feature endlessly tuned. The problem isn’t that the team doesn’t care; it’s that it cares so much it can’t see the work is already finished. The versions keep improving the artefact - and change the outcome by nothing. This activity finds the point at which the work achieved its purpose, shows what the effort since then has brought, and sets a line to stop at. 

How this works

Imagine a customer presentation that’s already strong enough to win approval. The team still spends three more days refining the wording, adjusting layouts and polishing slides - but the customer would have made the same decision using Tuesday’s version. This activity finds the ‘done’ point, shows what all the extra effort actually achieved, and decides where to stop next time. 

You start by defining the outcome the work was meant to achieve - the outcome, not the artefact. Then you walk through the versions, find the one that first achieved it, and mark it as the Done Line. Then the uncomfortable part: from that version to now, what changed in the outcome? Usually nothing - while the effort (revisions, hours, review rounds) accumulated. Seeing zero outcome gain against all that effort is the recognition. Then you set a fit-for-purpose line to stop at and redirect the saved effort to work that still needs it. 

This is not about lowering standards. It’s about seeing the work that was already done - and putting the effort where it still moves the outcome. 

Team: one person acts as the facilitator - they run the activity using the Facilitator Guide while everyone else takes part. (Works solo too.) 

Time required

Solo ✓   Team ✓ · About 20–25 minutes, with a facilitator for teams. 

The time required is indicative and will depend on the nature of the work. 

The facilitator should read the short facilitation guide first - about 8–10 minutes. It is a downloadable PDF on this page. 

When to use

Bring a real piece of work with a history of versions or revisions - a deck, report, feature, proposal - that keeps being refined past the point at which it was fit for purpose. 

Use it whenever: 

  • work keeps getting polished long after it would have done its job 
  • each new version improves the artefact but not the outcome 
  • ‘I can always find something to improve’ is quietly draining the team 
  • pride in quality or fear of criticism is keeping work open too long 

What you get

  • A clear purpose for the work - stated as an outcome you can check 
  • The Done Line: the version that first achieved that purpose 
  • The effort spent past it made visible - and the saved effort redirected 

You’ve done it well when: someone says ‘we improved the deck, not the decision’ - and the team sets a fit-for-purpose line and moves the saved effort to work that still needs it. 

The moment of recognition: the work first achieved its purpose at version five. Versions six to twelve improved the artefact - and changed the outcome by nothing. It was finished on Tuesday. 

What you’ll notice

  • The work was fit for purpose far earlier than anyone thought 
  • The extra effort improved the artefact, not the outcome 
  • ‘Better’ often just meant ‘different’ 

Why this works

The hardest part isn’t recognising that work is finished - it’s accepting it. For people who take pride in quality, continuing to polish feels responsible, even when it no longer changes the outcome - so no one calls the stop, and you don’t see the cost. Comparing the outcome before and after the extra work makes that invisible cost impossible to ignore. You can’t defend polish that bought nothing. 

What you need

You’ll need: 

  • One piece of work that has gone through multiple revisions 
  • Access to the different versions or review stages 
  • A facilitator (team version only) 
  • The Done-Line sheet 

Without version history, the activity won’t work - the reveal depends on finding where the work first achieved its purpose. If you can’t see the earlier versions, reconstruct the stages from memory or review rounds before you start. 

Steps

  1. State the purpose (3 min).Team: appoint a facilitator first. Fix the yardstick; everything else is judged against what was the work meant to achieve for whoever receives it. Write it as a checkable outcome. 
  2. Mark the Done Line (6 min).Find the first version that would already have achieved the outcome. Walk the versions: which one first achieved that purpose - would already have done the job? Circle it.
  3. Count what the effort bought (6 min). Make the wasted effort visible. From that version to now, what has changed in the outcome? If the outcome didn’t change, count what was spent improving the artefact instead: review rounds, revisions, meetings and hours. That gap - effort spent, outcome unchanged - is the reveal. 
  4. Set the line and redirect (7 min).Decide where to stop next time, and where the freed effort goes. Write the fit-for-purpose standard you’ll stop at, and name the work that still needs it. 

Output / Takeaways

You leave with: 

  • The Done Line marked on a real piece of work 
  • The effort spent past it made visible 
  • A fit-for-purpose line to stop at - and the saved effort redirected 

Important rules

  • State the purpose as an outcome, not a description of the artefact 
  • Run both reveals - where the line was, and what the extra effort bought 
  • Set a checkable line (‘the client can act’), not ‘high quality’ 
  • Redirect the saved effort - or stopping feels like loss, not gain 

Planning to facilitate this activity? Access the resources below to get started.