Every new request gets accepted, so the team keeps starting work but rarely finishes it. The hidden cost is that every new “yes” quietly delays something already in progress - each new thing you start takes attention away from everything else. This activity makes that trade-off visible, and helps the team limit how much work it takes on at once so work gets finished instead of just started.
Imagine your team already has ten things in progress. A stakeholder arrives with “one quick request.” Someone says yes. Nothing gets cancelled - but everything else slows down. That’s the moment this tool is built for.
As a team, you count what you’ve actually started but not finished. You set a deliberate limit on how many things can be in progress at once - fewer than the team is used to. Then you agree one rule: new work only starts when something finishes. The limit makes the cost of “yes” visible now, instead of weeks later when everything is late.
The real shift is this: the queue already exists. You’re only deciding whether it’s visible or hidden. Most teams run an invisible queue - work piling up inside half-finished tasks - and feel busy all day while little gets finished. This makes the queue visible, so the team can control it.
Team ✓ · About 25–30 minutes, with a facilitator.
The time required is indicative and will depend on the nature of the problem and the size of the team.
The facilitator must read the short facilitation guide first - about 8–10 minutes. It is a downloadable PDF on this page.
Use it when more work is entering than your team can clear.
Good signs it’s the right tool:
You’ve done it well when: the team agrees a limit and a rule - and starts finishing work before pulling in more.
Starting work feels productive. Finishing work creates value. When too many things compete for the same attention, everything slows down. Limiting work in progress forces the team to finish before starting something new.
Your current work in progress. Everything the team has started and not finished - from the board, tracker or what the team knows. This is the critical ingredient, and the hardest thing for teams to count honestly.
A board or wall. Room to lay out what’s in progress, side by side.
Sticky notes and a marker. One note per piece of work in progress.
Roles - Team: a facilitator (counts the work in progress, holds the limit, enforces the intake rule) and participants (list the work, set the limit, agree what waits).
Output / Takeaways
Important rules
Planning to facilitate this activity? Access the resources below to get started.